Natural Drainage Systems (NDS) and Pedestrian Improvement Designs
This project consists of designing and constructing natural drainage systems at three locations in the Delridge and Westwood neighborhoods. The project goals are to improve Longfellow Creek water quality, reduce drainage and flooding issues, and improve pedestrian safety.
Construction for the Longfellow Creek Natural Drainage Systems (NDS) project is scheduled to begin April 2022 and is expected to go through Fall 2023. Visit the project webpage for the most up-to-date construction information.