24th Ave SW Corridor

The project team has worked to balance current right-of-way usage with technical needs and permitting constraints in the development of this design. The project designs reflect the new natural drainage systems as well as:

  • Pedestrian improvements

  • The installation of a new curb and gutter system to help convey drainage to the NDS and enhance the street infrastructure. Note, this work will also involve the installation of a curb cut and driveway apron to connect to existing driveways.

  • Need for removal of items that are encroaching into the right-of-way where improvements will be made

  • Plans for new street trees, which provide multiple community benefits.

NDS and Sidewalk Improvements

24th Ave SW - Thistle to Cloverdale

24th_ThistleCloverdale_Aug2021.JPG

24th Ave SW - Cloverdale to Trenton

24th_CloverdaleTrenton_Aug2021.JPG

24th Ave SW - Trenton to Henderson

24th_TrentonHenderson_Aug2021.JPG

24th Ave SW - Henderson to Barton

24th_HendersonBarton_Aug2021.JPG

Typical Existing Street Condition

*Street conditions vary along 24th Ave SW

A cross seaction of the roadway. There are 2 lanes of travel, and pull-in parking o n the east side.

Street Conditions Design

Cross section of sidewalk with NDS between cloverdale and barton. There is 2 lanes of travel and parallel parking on eiter side of the roadway. The east side has an NDS buffer between the roadway and a sidewalk.

New sidewalk with Natural Drainage System
between SW Cloverdale St and SW Barton Pl

Natural Drainage System opposite new sidewalk
between SW Cloverdale St and SW Barton Pl

New sidewalk between SW Thistle St and SW Cloverdale St

New sidewalk with planting strip
between SW Cloverdale St and SW Barton Pl

What's in store for the 24th Ave SW corridor?

Illustration #1: Sidewalk view looking South between SW Cloverdale St and SW Trenton St

Illustration #2: Street view looking North between SW Barton St and SW Henderson St